Access the Full Project by Clicking here!
Bidjugde
JOB
(CMAR) BLVD Well Transmission Main
BID DATE
05/11/22 - 1:00
AGENCY
Avondale
ESTIMATE
$1,900,000
SCOPE
AWARD APRIL 2022: This project is the construction of approximately 3,700 LF of 12” Well Transmission Line, connecting the new BLVD Well (Well #33- SRP Shared Well) to an existing well transmission line that delivers water to the Coldwater Water Storage Facility. It includes construction of a new 12” raw water transmission line, extending from the Southwest corner of Avondale Boulevard and I-10, south along Avondale Boulevard to Van Buren Street, then west on Van Buren Street to connect to an existing 12” well transmission line in Van Buren. This new raw water transmission line will serve the new shared SRP well being constructed at the wellsite at the southwest corner of Avondale Boulevard and I10. The new water transmission line will be stubbed into the existing wellsite and terminated to allow future extension to the wellhead. The wellhead design is being performed by SRP and will be completed after the well transmission line is completed. Approximately 230 feet of the alignment at the north end is located within the limits of ADOT R/W at the Avondale Rd interchange. Construction will require coordination with ADOT and compliance with their construction guidelines. https://vrapp.vendorregistry.com/Bids/View/Bid/68dc1e65-15ba-46e7-89a5-65ed5e5355c2 jlin@avondaleaz.gov
UPDATES