Access the Full Project by Clicking here!
Bidjugde
JOB
Lacey Way Waterline Street Reconstruction
BID DATE
02/8/22 - 2:00
AGENCY
North Salt Lake
ESTIMATE
n/a
SCOPE
The work to be performed consists of furnishing all labor, tools, materials, equipment, transportation, and services required for installing approximately 1,015 LF of 8-inch PVC waterline, 2,420 LF of 12-inch HDPE waterline, 315 LF of 10” HDPE waterline, 120 LF of 6-inch HDPE waterline, fittings, fire hydrants, service laterals, water meters and setters. Installation of waterline will require trench excavation in street, replacing asphalt, concrete, connecting adjacent waterlines, installation of new collars for water valves and manholes. Street reconstruction will require asphalt removal and installation of 3,050 tons of asphalt; all in accordance with the Drawings and Specifications prepared by the North Salt Lake City Engineering Department. https://www.nslcity.org/bids.aspx?bidId=98 gary.kobzeff@nslcity.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT