Alton Parkway Left Turn at Civic Center
BID DATE
07/30/14 - 10:00
AGENCY
Irvine
ESTIMATE
$180,000
SCOPE
Removing existing medians and pavement section, constructing a left turn lane and medians in Alton Pkwy at the south driveway of the Civic Center. Work will include removing the doweled and textured concrete median, with curb across the San Diego Creek bridge including areas of concrete median beyond the bridge deck; removal of a portion of landscaped median and irrigation, construction of re-configured medians to provide for a new left turn lane, removing and replacing AC pavement, re-striping, signing, markings and other items not mentioned here, including the option to slurry seal the area, and items as required by the plans and the Special Provisions. Portia Mina, CPSM - 949-724-6184 pmina@cityofirvine.org