JOB
Northwest Recharge Recovery Delivery System Metro Water Independent Transmission Main
BID DATE
04/14/22 - 3:00 LIVE!
AGENCY
Metropolitan WD
ESTIMATE
$4,000,000
SCOPE
NWRRDS Transmission Main and Forebay Facility, M-19-003, to include approximately 38,000 LF of new 24-inch transmission main; approximately 750 LF jack and bore using 42” sleeve; 1-million gallon above-ground welded steel storage tank; tablet chlorination system; new building to house operations room and tablet chlorination system; yard piping with associated fittings and appurtenances; electrical, instrumentation, control, and security elements; and associated infrastructure and improvements. NWRRDS Recovery Well Equipping and Collector Pipelines, M-19-006 to include equipping 2 groundwater recovery wells; 2 hydro pneumatic tanks; 2 tablet chlorinator systems; yard piping with associated fittings and appurtenances; approximately 8,500 LF of 20-inch ductile iron transmission main; approximately 1,500 LF of 24-inch transmission main; and associated infrastructure and improvements. sbowen@metrowater.com engineering@metrowater.com LIVE: https://meet.goto.com/934701357 DOC LINK: https://drive.google.com/drive/folders/1uayaHUkJzy5N6wTAbdl2FJ0XOo7YoOgs?usp=sharing
UPDATES