Access the Full Project by Clicking here!
Bidjugde
JOB
Vado Lift Station 7 Improvements
BID DATE
02/22/22 - 2:00
AGENCY
Dona Ana County
ESTIMATE
n/a
SCOPE
The project consists of the rehabilitation of Vado Lift Station 7 which includes new submersible pumps, stainless steel piping, floats, accessories, and power/control panels, new access hatches, electrical work, generator, odor control system, and chain-link fencing. As part of this contract, 30 residential sewer service connections will be made to the DAC Utilities Sleepy Farms Wastewater collection system, and their existing septic tanks will be decommissioned to minimize the potential of groundwater contamination. http://www.bhinc.com/
UPDATES