Access the Full Project by Clicking here!
Bidjugde
JOB
Westwood Village Water Quality Program
BID DATE
01/11/22 - 2:00
AGENCY
Pearland
ESTIMATE
n/a
SCOPE
The project will entail the construction of approximately 2,500 linear feet of 6-inch diameter water distribution lines with all necessary valves and appurtenances. The work includes installation of fire hydrants at the end of the water lines at each north and south cul-de-sac for the following streets: Dogwood Dr, Elmwood Dr, Fernwood Dr, Greenwood Dr, and Hazelwood Dr. The work also includes installing a fire hydrant at the end of the water main on Cedarwood Dr S. Fire hydrants are also to be installed at both entrances of the subdivision: Springfield Ave & McLean Rd intersection and Springfield & Veterans Dr intersection, as indicated on the drawings. In addition, the work includes replacing five existing fire hydrants and relocating out of the sidewalk at Ashwood Dr N, Ashwood Dr S, Beechwood Dr S, Fernwood Dr S, and Hazelwood Dr S. https://pearland.ionwave.net/PublicDetail.aspx?bidID=1583&ret=OPEN&pg=0&bidNumber=&title=&type=&org= ebids@pearlandtx.gov
PREBID
1/5/2022 11:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT