Access the Full Project by Clicking here!
Bidjugde
JOB
FY19 20 Water Main Replacements
BID DATE
02/11/22 - 4:00
AGENCY
Salt Lake
ESTIMATE
$3,823,626
SCOPE
The project consists of four sites that will have water mains replaced. Site 1 installs approximately 2000 linear feet of 12-inch PVC waterline along 200 South from approximately 600 West to 850 West (Jeremy St.) that will replace the two existing mains. All service connections to be reconnected. Site 2 installs approximately 1600 linear feet of 12-inch PVC waterline to replace one of the two existing mains within the 1000 North roadway from Redwood Rd. to 1500 West. Site 3 installs approximately 1800 linear feet of 8-inch DI waterline to replace the single main that runs around Brookshire Dr and Millstream Ln, all services to be reconnected. Site 4 installs approximately 1800 linear feet of 12-inch DI waterline along 700 East, from Scott Ave to Springview Dr. with all services to be reconnected. Kevin Kranendonk +801 (483) 6841 kevin.kranendonk@slcgov.com
UPDATES