Access the Full Project by Clicking here!
Bidjugde
JOB
Papago Street Sewer Reconstruction
BID DATE
02/1/22 - 1:30
AGENCY
Gila Bend
ESTIMATE
n/a
SCOPE
Sewer line construction, concrete pier construction, grading and drainage, and miscellaneous horizontal construction work. An existing 8-inch sewer line that runs along the south right-of-way line of Papago Street currently crosses two washes above-ground on piers. This federally funded project consists of the reconstruction of existing sewer lines crossing washes at two (2) locations along the south side of Papago Street between Washington Street and Cholla Avenue, for a total length of approximately 260 feet. The major items of work include the following construction items: 1. New 8-inch Ductile Iron Pipe and Fittings 2. Construct Pier Supports 3. Trench Excavation, Backfill, and Compaction 4. Bypass Pumping to Maintain Existing Sewer Flow 5. Miscellaneous Grading dwallace@rickengineering.com https://www.gilabendaz.org/bids.aspx?bidID=16
PREBID
1/18/2022 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT