Access the Full Project by Clicking here!
Bidjugde
JOB
24 36 Inch Maple Avenue Interceptor Phase I
BID DATE
02/1/22 - 11:00
AGENCY
Alvarado
ESTIMATE
$6,200,000
SCOPE
The Project will include but is not limited to: 1. The installation of approximately 1,190 linear feet of 36” sanitary sewer, 1,175 linear feet of 30” sanitary sewer, 2,350 linear feet of 24” sanitary sewer, by open cut and other than open cut, and 665 linear feet of 54” and 48” steel casing, by other than open cut. 2. The installation of 8 standard 5-foot diameter sewer manholes, 9 standard 6-foot diameter sewer manholes, 3 standard 5-foot drop manholes, and 1 standard 6-foot diameter polymer drop manhole. 3. The installation of 6,200 square yard asphalt pavement (as an alternate full depth or mill and overlay). 4. The installation of approximately 200 linear feet of 12” water line and 400 linear feet of 6” water line by open cut. Please direct all quesitons related to the design of this Project to the Q&A Section. https://www.civcastusa.com/project/61c32164eeabececd3da0691/summary jsj@freese.com
PREBID
1/11/2022 11:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT