Access the Full Project by Clicking here!
Bidjugde
JOB
Pure Water Program Morena Conveyance South Middle Morena Bike Lanes
BID DATE
03/17/22 - 2:00
AGENCY
San Diego
ESTIMATE
$116,300,000
SCOPE
Morena Conveyance South: The Morena Conveyance South project includes the installation of 48” wastewater forcemain pipeline (approx. 17,404 LF) and 30-inch Welded Steel Pipe brine centrate/conveyance pipeline (approx. 17,840 LF) from the Morena Pump Station located at the corner of Sherman and Custer Streets east along Sherman Street, north along Morena Boulevard, east on Milton Street, North on Chicago Street, east on Jellett Street, north on Denver Street and east on Clairemont Drive until Iroquois Avenue, and associated appurtenances Morena Pipelines: The Morena Pipelines project includes the removal and replacement of 16” cast iron water distribution main with polyvinyl chloride (PVC) (approx. 14,686 LF) and the installation of a 36” Welded Steel Pipe water transmission main (approx. 18,308 LF) and associated appurtenances. The Morena Pipelines move north along Morena Boulevard and Old Morena Boulevard from Napa Street to Balboa Avenue. Phase 1 North City Pure Water Project, Morena Conveyance (BL): This project will install Class II (bike lanes) with buffer, bicycle loops, Sharrows and signage as per plan on the following roadway: Clairemont Dr between Iroquois Avenue and Denver Street and Morena Blvd between Balboa Avenue and Napa Street. https://pbsystem.planetbids.com/portal/17950/bo/bo-detail/89320 Stephen Samara 619-533-3619 ssamara@sandiego.gov
UPDATES