(CMAR) Avondale 10th Street Force Main Replacement
BID DATE
03/29/22 - 5:00
AGENCY
Avondale
ESTIMATE
$3,000,000
SCOPE
This project will replace the existing ductile iron pipe portions of the force main with HDPE pressure pipe. The portion of the existing force main from Eliseo Felix Jr. Way to the east side of the Agua Fria River is PVC piping, which shows no degradation. The PVC portion of the existing force main will not be replaced. Replacement of the existing ductile iron pipe is necessary to maintain the integrity and operation of the existing force main. ProcurementOffice@AvondaleAZ.gov