Access the Full Project by Clicking here!
Bidjugde
JOB
Kelcy Way Road Improvement
BID DATE
01/7/22 - 3:00
AGENCY
Early
ESTIMATE
n/a
SCOPE
Concrete removal, if needed shall include neat saw cut adjacent to existing structures, drives, and sidewalks to remain in place and at other location as directed by the Engineer. Reinforcing bars for, Class A Concrete used in sidewalk, if applicable, shall be #4 bars on 18" centers unless otherwise approved by the Engineer. https://www.earlytx.net/bids.aspx?bidID=11

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT