Sacramento River Erosion Contract 1
BID DATE
02/1/22 - 10:00
AGENCY
Department Defense
ESTIMATE
n/a
SCOPE
The scope of w ork for Sacramento River Erosion Contract 1 is 1,150 feet of erosion protection measures located above and below the average low flow w ater surface elevation. These measures include but are not limited to a 5-foot-thick lens of launchable Grade C quarry stone below the w ater surface to protect the bank from scour and erosion, a 2.5 foot thick lens of soil-rock mix and brush layering above the w ater surface to protect the bank from w ave w ash generated by boat w akes and w ind w aves, and transitions to existing grade at the upstream and dow nstream ends of the site for both soil-rock mix and quarry stone measures. Additionally, planting benches w ill vary in w idth and allow for subsequent planting of native riparian species. https://sam.gov/opp/ed67afc9655f4c0bbd6fd7a68f28186c/view Melissa.a.denigris@usace.army.mil