JOB
Franklin Blvd 39 Inch Diameter Lining
BID DATE
08/14/14 - 2:00
AGENCY
Sacramento County
ESTIMATE
$300,000
SCOPE
The project consists of closed circuit television inspection of approximately 1,482 lineal feet of 39-inch diameter sanitary sewer main line, cleaning of approximately 741 lineal feet of 39-inch diameter sanitary sewer main line, installation of approximately 741 lineal feet of 39-inch diameter cured-in-place pipe, sewer flow control, and all other work contained in the project documents. Questions regarding the FRANKLIN BOULEVARD 39” DIAMETER LINING PROJECT are to be directed to Dillon Miele at 916-876-6480 or email at mieled@sacsewer.com.