San Angelo DWSRF Hickory GW Supply System Expansion
BID DATE
01/27/22 - 2:00
AGENCY
San Angelo
ESTIMATE
$35,000,000
SCOPE
Improvements to the City’s Groundwater Treatment Plant to increase production capacity from 8 MGD to 12 MGD by expanding the oxidation contactor system, expanding the iron removal filtration system, expanding the radium reduction system, constructing a triplex low-head pump station, and constructing two (2) new 2.0 MG precast concrete clearwells. Improvements at the Hickory Well Field will include completion of five (5) new well heads, electrical, controls, well site improvements, extension of interconnecting well field piping, extension of site roadways, and expansion of the booster pump station to provide a reliable pumping capacity of 12 MGD. https://www.civcastusa.com/project/61b9f0d5b743b5dc1b5a05b5/summary leroy.arce@e-ht.com
PREBID
1/11/2022 1:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT