Access the Full Project by Clicking here!
Bidjugde
JOB
Continental Ranch Parcel 28 Pavement Reconstuction
BID DATE
08/29/14 - 4:00
AGENCY
Marana
ESTIMATE
n/a
SCOPE
A Pre-Bid Conference is scheduled for this project at 10:00 a.m. on Wednesday, August 6, 2014 The work for CR28 consists of removing 18,261 square yards of asphaltic concrete by milling, rework subgrade and compact to 100%, cement treated base as required by the Engineer, repave the surface course with two (2) inches of PAG 2 asphalt, remove and replace existing handicap ramps, remove sidewalk and wedge curb and install new handicap ramp, re-install survey monuments, reset sewer manhole frames and covers, reset frames and covers for water valve boxes, provide residential notices and traffic control and hold a neighborhood resident meeting. All concrete construction (handicap ramps, curb/sidewalk removal & replacement) shall be performed prior to removal of the existing asphaltic concrete. Reworking of the subgrade/aggregate base shall be considered incidental to the contract work and no measurement or payment for this operation shall be made. Patrick OKane (520) 382-2679 pokane@marana.com

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT