Access the Full Project by Clicking here!
Bidjugde
JOB
Pascua Yaqui Tribe Tortuga Ranch
BID DATE
01/7/22 - 3:00
AGENCY
Pascua Yaqui Tribe
ESTIMATE
n/a
SCOPE
Install 2-1/2" DR 11 or PVC waterline, with tracer wire, extending 14,800 feet, including excavation/trenching to provides specified depth to top of waterline to be greater than 18 with backfill, compaction and pressure testing, to extend from newly built pump house specified by plans to avoid any protected areas and to come back to surface by proposed water tank area at ranch site. Includes two areas for the line to be brought back to surface for stub outs to facilitate undisturbed native soil with a shielded compacted dirt mound from UV and light traffic. Per USDA Plans Gonzalez@pascuayaqui-nsn.gov
PREBID
12/16/2021 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT