Access the Full Project by Clicking here!
Bidjugde
JOB
Ina Road Construction Debris Landfill Closure Phase 2 (REBID)
BID DATE
03/3/22 - 2:00 LIVE!
AGENCY
Pima County
ESTIMATE
$7,625,525
SCOPE
Org bid: Meridian - AZ - $8,222,080 Scope of Work includes filling and compacting water rills and returning perimeter storm water channels to design grade by removing sediment currently within them. Excavation, loading and hauling of soil from Cal Portland’s Sunset Pit to the Ina Road Construction Debris Landfill (IRCL). Placing and compacting soil at the IRCL with other final design installations as described in Phase 2 Specifications. LIVE: https://teams.microsoft.com/l/meetup-join/19%3ameeting_ZjVlNWM2YWYtMTgzMi00N2E3LTk2YmYtNzMyZTY5NmUzNGRh%40thread.v2/0?context=%7b%22Tid%22%3a%2233b6e2c3-0b1a-4879-b741-47461a6c1a89%22%2c%22Oid%22%3a%22cf9fc984-f72b-4a33-b4a4-eaaafab9ad5a%22%7d Denise.Waldo@pima.gov
UPDATES