Access the Full Project by Clicking here!
Bidjugde
JOB
Waco Highway 84 Corridor Wastewater System Improvements Phase 3 Contract B
BID DATE
01/11/22 - 2:00
AGENCY
Waco
ESTIMATE
n/a
SCOPE
The project includes the installation of approximately 7,336 LF of 30-in wastewater gravity main, 14 LF of 27-in wastewater gravity main, 21 LF of 12-in wastewater gravity line, 85 LF of 8-inch wastewater gravity main, 40 LF of 6-inch wastewater gravity main, 53 LF of 4-inch wastewater gravity main, 200 LF of 42-In steel casing installed by bore, 75 LF of 42-In casing installed by open cut, 31 LF of 16-inch relocated water line, manholes, a junction box, erosion controls, pavement repair, concrete trail removal and replacement, traffic control, a project sign, bypass pumping, connections to the existing wastewater system, abandonment of existing manholes, adjustment of existing manholes, and related appurtenances. The project alignment commences at the Church Road Lift Station located near the intersection of Old Lorena Road and Church Road and extends west-southwest to a manhole in Harris Creek Road just south of Leafy Hollow Lane. https://www.civcastusa.com/project/61aa4d6dbb856882df75ddc1/summary victorv@wacotx.gov
PREBID
12/17/2021 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT