Access the Full Project by Clicking here!
Bidjugde
JOB
Calle Vista Torito Storm Drain Repair
BID DATE
12/14/21 - 5:00
AGENCY
San Clemente
ESTIMATE
$60,000
SCOPE
The existing storm drain located on the hillside adjacent to Calle Vista Torito has experienced erosion from a recent pipe rupture southeast of the subject site. As a result of a large volume of water flowing uncontrolled over the slope face, portions of the storm drainpipe have been exposed and/or undermined. The City of San Clemente wishes to fix the situation explained above by removing the entire existing storm drain pipe (except the first and last +/- 5 feet) and replace it with an HDPE pipe, measuring approximately 50 feet in length. The majority of the new pipe will be buried, however portions of it may be constructed above grade, therefore slope anchors are anticipated to be installed with the new HDPE pipe. Earthwork at the site will generally consist of clearing and grubbing excessive organic materials (trees and shrubs) and debris, cleaning out the eroded areas and/or area below the existing pipe in order to establish a suitable bottom, followed by backfilling the eroded areas, followed by construction of the new HDPE pipeline. https://pbsystem.planetbids.com/portal/28939/bo/bo-detail/88923 Shawn Ryan 949-361-6122 ryans@san-clemente.org
PREBID
12/9/2021 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT