Access the Full Project by Clicking here!
Bidjugde
JOB
ACTON Municipal Utility District Blackhawk Circle Water Line Improvements
BID DATE
12/14/21 - 10:00
AGENCY
Wylie
ESTIMATE
$95,000
SCOPE
Installation of approximately 390 linear feet of 8-inch diameter PVC water line, fire hydrant, connection to existing 6-inch diameter water line, connection to existing 2-inch diameter water line, valves, and service reconnections. ref='https://www.civcastusa.com/project/619babe0b743b55807964b7e/summary' target='_blank'>https://www.civcastusa.com/project/619babe0b743b55807964b7e/summary chris.hay@e-ht.com

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT