Access the Full Project by Clicking here!
Bidjugde
JOB
Sanitary Sewer Rehabilitation Euclid Avenue Grizzly Peak Boulevard
BID DATE
12/21/21 - 2:00
AGENCY
Berkeley
ESTIMATE
$2,000,000
SCOPE
a) CIPP lining (Method "A") of approximately 376 linear feet of 6-inch diameter sanitary sewer main. b) CIPP Lining (Method "A") of approximately 1,622 linear feet of 8-inch diameter sanitary sewer mains. c) Pipe-bursting (Method "B") rehabilitation of approximately 114 linear feet of 6-inch and 8-inch diameter sanitary sewer mains d) Pipe-bursting (Method "B") rehabilitation of approximately 1,145 linear feet of 10- inch diameter sanitary sewer mains. e) Traditional Open-trench (Method "C") replacement of approximately 340 linear feet of 4-inch, 6-inch, and 8-inch diameter sanitary sewer mains. f) Traditional Open-trench (Method "C") replacement of approximately 170 linear feet of 10-inch diameter sanitary sewer main. g) Traditional Open-trench (Method "C") replacement of approximately 607 linear feet of 18-in diameter sanitary sewer main. h) Traditional Open-trench (Method "C") replacement of approximately 55 linear feet of 4-inch, 6-inch, and 8-inch diameter sanitary sewer main. i) Replacement of approximately 187 linear feet of 4-inch and 6-inch diameter sanitary sewer laterals j) Construction and rehabilitation of maintenance holes including excavation and related work. The project will include pre-cast concrete and fiberglass reinforced (FRP) maintenance holes. k) All of the work sites are located within City of Berkeley Fire Zone 2 and are subject to restriction imposed during the Red-Flag warnings. l) Many of the work sites are located on private properties with limited access. dakagi@cityofberkeley.info
PREBID
12/7/2021 9:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT