2021 CIP Water Pipeline Replacement
BID DATE
12/15/21 - 2:00
AGENCY
Redlands
ESTIMATE
$4,000,000
SCOPE
The scope of work for this project is the installation of approximately 19,000 linear feet of 8” DIP and 750 linear feet of water pipeline including water services, valves, fire hydrants, etc. The work shall consist of furnishing and installing all pipe, fittings, and appurtenances; all traffic control; all utility location and verification; all pavement removal and disposal; all pavement repair; all earthwork; compacting; protecting in place or removing and replacing all existing utilities, trees, and public and private improvements; testing and disinfecting all pipelines; replacing destroyed survey monuments; disposing of excess soil and rock material and restoring all areas and improvements to pre-construction conditions. https://pbsystem.planetbids.com/portal/24639/bo/bo-detail/88839 Gerard Nepomuceno 909-798-7584 x4 gnepomuceno@cityofredlands.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT