Access the Full Project by Clicking here!
Bidjugde
JOB
Red Mountain Freeway SR202 (202-A-(203)T)
BID DATE
08/22/14 - 11:00 LIVE!
AGENCY
ADOT
ESTIMATE
n/a
SCOPE
The proposed shared use path project is located in Maricopa County within the city of Tempe along the south bank of the Salt River, starting from east of McClintock Drive and extending east approximately 1.2 miles. The proposed work includes one 12-foot wide concrete path with lighting and safety railing, and construction of a bridge under the Loop 202/Loop 101 traffic interchange and retaining walls. The work also includes pathway excavation including Cement Stabilized Alluvium (CSA), structural excavation and embankment construction, grading, furnishing and placing Portland Cement Concrete Pavement, construction fencing, furnishing and installing signing, LED lighting with solar arrays, landscape salvage and replacement, and other related items of work.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT