JOB
Manadas Creek Wastewater Treatment Plant
BID DATE
01/20/22 - 4:00
AGENCY
Laredo
ESTIMATE
n/a
SCOPE
The scope of work shall include a new Wastewater Treatment Plant with a pennitted treatment capacity of 4.75 MGD and consist of two gravity interceptor pipe systems, liquid treatment process including lift station, headworks screening, odor control system, extended air activated sludge aeration basins, secondary clarification, RAS/WAS pump station, ultra-violet disinfection and associated yard piping, controls and gravity pipe outfall to Manadas Creek Tributary 2. Solids handling processes include thickening of WAS, aerated sludge holding tank, gravity belt thickening and belt filter press dewatering. The facility is master planned for a future conversion to complete mix activated sludge aeration to accommodate ultimate projected flows (9.5 MGD).