Access the Full Project by Clicking here!
Bidjugde
JOB
Iron Horse Trail Bridge Dublin Blvd
BID DATE
01/20/22 - 2:00
AGENCY
Dublin
ESTIMATE
$10,000,000
SCOPE
The Project is more specifically defined in the Contract Documents, but generally includes construction of a bicycle and pedestrian bridge over Dublin Boulevard near the Dublin Boulevard and Scarlett Drive intersection including a prefabricated steel arch truss bridge, elevated concrete approaches, approach ramps, and decorative retaining walls. The project will require furnishing all labor, materials, tools, equipment, transportation, and services necessary to perform the construction and installation of the following: clearing and demolition of trees, soils, asphalt and concrete; cast-in-place piles and footings, retaining walls, lightweight cellular concrete backfill, bridge fabrication and erection, pre-stressed concrete approaches, steel guard railings, steel mesh throw prevention, trail and bridge lighting, associated earthwork, asphalt paving, minor concrete and other items not specifically mentioned herein. Will Wahbeh 925-833-6630 william.wahbeh@dublin.ca.gov https://dublin.ca.gov/Bids.aspx?BidID=250
UPDATES