City Rockwall IH 30 Utility Relocations
BID DATE
11/23/21 - 2:00
AGENCY
Rockwall
ESTIMATE
n/a
SCOPE
As set forth in the plans and specifications, the project is designed to relocate existing City of Rockwall utilities that are found to be in conflict with TxDOT design for IH 30 (From Lake Ray Hubbard to SH 205) construction. This project involves installing approximately 4,500 LF of new 8” and 16” PVC water main, valves and fire hydrants. Approximately 1,300 LF of new 8” and 10” PVC wastewater main and concrete manholes are to be installed as part of this project. The existing water mains and wastewater mains to be removed and/or abandoned in place. https://www.civcastusa.com/project/618598421b137db45e3ce62b/summary sara.hutson@volkert.com