Access the Full Project by Clicking here!
Bidjugde
JOB
FM 845 Utility Relocations
BID DATE
12/2/21 - 2:00
AGENCY
Cameron
ESTIMATE
$275,000
SCOPE
Base Bid • Furnish and Install 241 LF of 8” & 2” Water Line by Open Cut; • Furnish and Install 260 LF of 8” & 4” Wastewater Line by Open Cut; • Furnish and Install 900 LF of 4” Force Main by Open Cut; • Furnish and Install 142 LF of 8” Steel Encasement by Open Cut; • 2 EA – Furnish and Install Concrete Manholes; • 10 EA – 8”, 6” & 4” Gate Valves; • Water Service Connections & Transfer of Existing Waterlines • Cut & Cap Existing 8”, 6”, 4” & 2” Waterlines to be Abandoned; • Remove Existing Manhole on Karnes Avenue; • Removal and Replacement of Existing Asphalt & Gravel Driveways; • Testing for Water and Wastewater Lines; General Items • Preconstruction Video; • Traffic Control Plan & Implementation; • Trench Safety Plan & Implementation; • Erosion Control Measures; https://www.civcastusa.com/project/618423d79bb36e7d13ab6808/summary jblair@kpaengineers.com ; ecox@kpaengineers.com
PREBID
11/16/2021 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT