BCRUA Phase 2 Raw Water Delivery System
BID DATE
03/22/22 - 2:00
AGENCY
Wylie
ESTIMATE
$200,000,000
SCOPE
The Work includes furnishing labor, materials, equipment and services for construction of the Brushy Creek Regional Utility Authority Phase 2 Raw Water Delivery System as specified and detailed in the Contract Documents. The major project elements include two lake taps with multilevel screens, a gravity intake tunnel with a minimum 8-ft internal finished diameter cast-in-place concrete liner, an underground suction chamber with 6 well shafts, a 30-ft diameter, 300-ft deep construction access shaft, a transmission tunnel with a 78-inch welded steel final liner, a 145 MGD pump station, and a maintenance building for chemical feed systems to control invasive mussels. https://www.civcastusa.com/project/618011e96902b7a00d8d2f56/summary jchristensen@walkerpartners.com