Access the Full Project by Clicking here!
Bidjugde
JOB
Jamboree Road Pavement Rehabilitation Reclaimed Water Conversion
BID DATE
12/7/21 - 10:00
AGENCY
Newport Beach
ESTIMATE
$4,740,000
SCOPE
The work necessary for the completion of this contract consists of mobilization and demobilization; best management practices (BMP); traffic control plan preparation and implementation; staking and survey monument restoration; utility company coordination and utility verification; clearing and grubbing, removal of existing roadway improvements, subgrade preparation, cold milling of existing asphalt pavement roadway; construction of asphalt concrete (AC) pavement, asphalt rubberized hot mix (ARHM) pavement, full depth pavement section repairs, PCC sidewalk; stamped PCC median pavement; PCC cross gutter and spandrels; PCC curb and gutter, PCC median curb, PCC curb ramps, truncated domes, storm drain improvements, catch basin / inlet improvements and modifications; median parkway drain and river rock; utility adjustments, traffic signage improvements, striping and painted curb improvements, traffic signal improvements; patching damaged PCC curbs; importing and placing new Class A topsoil; irrigation system improvements; reclaimed water system improvements; hydroseeding; root pruning trees and root barrier installation; minor landscaping and irrigation repairs adjacent to PCC repairs, as-built plan preparation, and all other work required by the Contract Documents. https://pbsystem.planetbids.com/portal/22078/bo/bo-detail/88471 Patricia Carpenter 949-644-3344 pcarpenter@newportbeachca.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT