West Side Water Main Replacement
BID DATE
12/3/21 - 3:00
AGENCY
San Felipe Pueblo
ESTIMATE
n/a
SCOPE
The Project includes the following Work: Construction of an 8" PVC water main and 10" PVC Connection, throughout the San Felipe Pueblo village to replace the existing system. The water main installation will include all Appurtenances, including required Fittings, Gate Valves, Fire Hydrants, Connections to Existing Water Main, and improvements to the existing Pumphouse Plumbing. Repairs of existing paved surfaces and restoration of unpaved surfaces are required Bohannan Huston https://bhitracker.bhinc.com/

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT