Navajo Gallup Water Supply Reach 27 11
BID DATE
12/8/21 - 2:00
AGENCY
Gallup
ESTIMATE
n/a
SCOPE
The project consists of installing approximately 7,300 linear feet of 14” CL350 ductile iron waterline, 6,600 linear feet of 12” CL 235 DR18 C900 PVC waterline, and a meter station. Work will also include air release stations, valves, fittings, specials, grade control structures and devices, grading, excavation, trenching, backfilling, and compaction. Asphalt, gravel road surfacing and fencing will also be required. frodriguez@gallupnm.gov