Access the Full Project by Clicking here!
Bidjugde
JOB
Dunlap Boulevard Bridge Replacement Crossing Wilson Creek Channel Phase I
BID DATE
12/7/21 - 3:00
AGENCY
Yucaipa
ESTIMATE
n/a
SCOPE
Removal of portions of, and replacement of the existing Dunlap Boulevard Culvert with a new prefabricated steel bridge structure Associated street improvements to connect the new bride structure to the existing street improvements in Dunlap Boulevard. Street improvements will be limited to just those required for interim connection to the bridge structure. Ultimate street improvements (curb, gutter, sidewalk, utilities, etc.) will be completed as part of the Phase II project, not included in this bid. The bottom of the existing RCB culvert shall be protected in place and joined to the proposed reinforced concrete channel invert and bridge abutment. Debbie Shortlidge 909-797-2489 x254 dshortlidge@yucaipa.org https://pbsystem.planetbids.com/portal/47350/bo/bo-detail/88055
UPDATES