Jordan River Siphon District Outfall Line
BID DATE
01/6/22 - 10:00
AGENCY
Taylorsville Bennion Improvement District
ESTIMATE
n/a
SCOPE
PREQUAL 11/23/21, BIDS DUE 1/6/22The construction of drinking water pipeline improvements including 6,615 feet of 24-inch C900 PVC transmission pipeline. This includes 2,600 linear feet of trenching and asphalt restoration in UDOT right-of-way in 5400 South, about 6400 square yards of 1-inch mill and overlay with open graded surface course (OGSC), with 190 feet of trench under the I-215 overpass requiring internally braced shoring, and 295 feet of trench being backfilled with flowable fill. It also includes 4,015 feet of trenching and asphalt restoration in Taylorsville right-of-way in 2200 West. aspencer@halengineers.com tnorth@tbid.org bpacker@bowencollins.com