Access the Full Project by Clicking here!
Bidjugde
JOB
Recycled Water Easterly Main Extension
BID DATE
08/14/14 - 2:00
AGENCY
Escondido
ESTIMATE
$5,496,000
SCOPE
Furnish and install: approximately 13,800 lineal feet of 28-inch diameter DR 11 HDPE recycled water pipeline, approximately 13,800 lineal feet of 16-inch diameter DR 21 HDPE brine line, asphalt concrete (AC) pavement restoration, precast concrete manholes, buried isolation valves, air valves, blow-offs, connection to existing facilities. Neil Greenwood City of Escondido Utilities/ HARRF 201 N Broadway Escondido, CA 92025 Tel:(760) 839-4078 Fax:(760) 740-0948 ngreenwood@ci.escondido.ca.us

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT