Access the Full Project by Clicking here!
Bidjugde
JOB
Kemah Crossing Sewer Lift Station
BID DATE
11/9/21 - 1:30
AGENCY
Meritage Homes
ESTIMATE
n/a
SCOPE
The project includes the complete construction of the Kemah Meritage Lift Station, to include all the general construction, mobilization, excavation, backfill, yard piping, valve piping and appurtenances, submersible pumps with bases and guide rails, wet well, sanitary sewer pipes and manholes, connection to the existing force main, pipe/structure interior/exterior coatings, water pipe, related site work, site fill and grading, permanent fencing and gate, electrical controls and instrumentation, generator platform, electrical work, SCADA integration, SWPPP, natural gas generator, erosion control measures, access to site, coordination with gas and electric providers, flex base, clean up and site restoration, startup of station, all testing, all equipment, materials, and services required in accordance with the Contract Documents, plans, and specifications for the Project. https://www.civcastusa.com/project/6169f3ce7fd6b3e13c055b2d/summary dan.elkins@kimley-horn.com
PREBID
10/26/2021 1:30

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT