Access the Full Project by Clicking here!
Bidjugde
JOB
West Silver Eagle Bridge Overhead Joint Repair
BID DATE
11/3/21 - 2:00
AGENCY
Sacramento
ESTIMATE
$565,560
SCOPE
The following items of work are to be performed in these Special Provisions: Partial removal of the bridge deck and sidewalk at existing strip joint seal assemblies at Abutments 1 and 7. Removal of existing strip joint seal assemblies and installation of new strip joint seal assemblies at Abutments 1 and 7, replacement of elastomeric bearings at both abutments, including jacking and temporary support of the bridge superstructure, removal and replacement of sidewalk joint armor at both abutments, and resetting of curb plates at both abutments. The location of work is on the West Silver Eagle Road Bridge and Overhead between Northgate Boulevard and Norwood Avenue. The west approach to the bridge/overhead carries San Juan Road; the east approach carries West Silver Eagle Road https://pbsystem.planetbids.com/portal/15300/bo/bo-detail/87724 Jose Ledesma JLedesma@cityofsacramento.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT