JOB
(CMAR) Farallon Water Campus 16
BID DATE
02/9/22 - 2:00
AGENCY
Buckeye
ESTIMATE
$40,000,000
SCOPE
Well site development, equipping and onsite piping. Up to ten well sites providing an average of 500-gpm each are anticipated to meet the Phase 1 goal of 6.28-mgd for a firm capacity of 4.71 mgd (based on 18 hr. duty cycle) • Offsite piping including individual well site transmission piping to a large diameter collector transmission main to the Water Campus site and potable water distribution piping from the Water Campus. • Farallon Water Campus. The campus is anticipated to include aboveground cast-in-place concrete storage tanks, booster pumps, hydro pneumatic tanks, treatment (some combination of blending, arsenic and/or reverse osmosis depending on available water quality), and chlorination facilities for 4.71-mgd of firm capacity. dfasano@buckeyeaz.gov https://www.buckeyeaz.gov/Home/Components/RFP/RFP/138/409