Access the Full Project by Clicking here!
Bidjugde
JOB
East Coast Highway Marguerite Avenue Pavement Rehabilitation
BID DATE
10/28/21 - 10:00
AGENCY
Newport Beach
ESTIMATE
$3,700,000
SCOPE
The work necessary for the completion of this contract consists of mobilization, demobilization and cleanup, distribution of construction notices to existing businesses and residents, providing CalRecycle grant documents, preparing and updating schedule, best management practices (BMP), attending weekly construction meetings, potholing existing utilities to protect in place, removal of in-ground flashers, design traffic control plans, traffic control plan implementation, surveying, survey monument preservation and restoration, utility company coordination and verification, clearing and grubbing, tree removals, concrete curb and gutter, concrete cross gutter, concrete spandrel, concrete sidewalk, concrete access ramps and truncated domes, concrete driveway approaches, concrete alley approaches, concrete local depression, removal of existing roadway improvements, subgrade preparation, full depth pavement section repairs, cold mill of existing pavement, construction of asphalt concrete (AC) pavement leveling course and asphalt rubberized hot mix (AHRM) surface course, remove and install utility valve box and covers to grade, adjust manhole frame and covers to grade, install new manhole frame and covers, adjust OCSD manhole frame and cover to grade and reinstall PVC liner, remove and install electrical pull box, install traffic signal detector loops, install traffic signage improvements, striping and painted curb improvements, removal of in-ground flashers, as-built plan preparation, and all other work required by the contract documents. Ben Davis 949-644-3317 bdavis@newportbeachca.gov https://pbsystem.planetbids.com/portal/22078/bo/bo-detail/87464

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT