Access the Full Project by Clicking here!
Bidjugde
JOB
San Pablo Avenue Rehabilitation
BID DATE
10/25/21 - 10:00
AGENCY
Pinole
ESTIMATE
n/a
SCOPE
The Work generally consists of the installation of curb ramps, retaining walls, pavement stripes and markings, base failure repairs, and asphalt pavement grinding and overlay along San Pablo Avenue between Pinole Shores Drive to the westerly City limits. Refer to the Plans for a detailed description of the location. More specifically, the Work consists of, but is not limited to, saw-cutting; removal of existing asphalt concrete and Portland Cement concrete pavements, curb, gutter, ramps, and sidewalk, as required; construction of new portland cement concrete curb, gutter, ramps, and installation of asphalt concrete pavement, adjusting storm drain and utility boxes to grade, installation of pavement striping and markings, traffic control, installation of traffic signal loop detectors, associated wiring, wooden retaining wall, and conforming to adjacent landscape areas. Work around and in the City right of way is required mkaur@ci.pinole.ca.us

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT