Access the Full Project by Clicking here!
Bidjugde
JOB
Wastewater System Infrastructure Retrofit Pine Gully WWTP
BID DATE
11/4/21 - 10:00
AGENCY
Seabrook
ESTIMATE
n/a
SCOPE
Construction of a 2.5 MGD Wastewater Treatment Plant, Including but not Limited to Headworks Structure, Mechanically-Cleaned Bar Screen and Screw Press, Aeration Basins, Clarifiers, Chlorine Contact Basins, Digester Basins, Non-Portable Water System, R.A.S. and W.A.S Pump Station, Odor Control System, On-Site Lift Station, Dewatering and Blower Building, Operations Building, Chemical Building, all Equipment, Piping, Control Panels, Coatings and Appurtenances, and all Else Specified and Shown in the Contract Documents. https://www.civcastusa.com/project/615f60a7b0829376eb4e97d2/summary
PREBID
10/21/2021 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT