Access the Full Project by Clicking here!
Bidjugde
JOB
Willow Street Bridge Replacement Water Line Relocation
BID DATE
08/27/14 - 2:00
AGENCY
Chula Vista
ESTIMATE
$1,670,000
SCOPE
This is the first phase of a two-phase project that will ultimately replace the existing 2-lane Willow Street Bridge with a new 4-lane bridge. The improvements primarily associated with Phase I includes relocating an existing 32-inch water transmission line (Sweetwater Authority) and an existing 36-inch water transmission line (City of San Diego, that run along the westerly side of the existing Willow Street Bridge and also traverse the northerly end, outside of the proposed bridge envelope. The work includes installation of a 48-inch and 36-inch water transmission lines, clearing and grubbing, excavation and grading, removal and disposal of existing improvements, installation of temporary environmental fencing, installation of asphalt concrete pavement, said seal, crushed aggregate base, saw cutting, pavement striping, traffic control, protection and restoration of existing improvements and other miscellaneous work. Greg Tscherch, 619-409-1974 gtscherch@chulavistaca.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT