JOB
Lift Station 15 Rehabilitation
BID DATE
04/12/22 - 3:00
AGENCY
Fresno
ESTIMATE
$240,700
SCOPE
The scope of work includes the removal of obsolete electrical equipment, block wall, SCADA antenna, gavel landscape covering, suction bypass and surface repair debris and construction of portions of existing Lift Station 15, including the epoxy recoating rehabilitation in existing sewer wet well and connecting chamber, installation hatches safety grates, 6” camlock suction bypass, 24” x 24” drain basin with grate and all associated connecting piping, fittings, appurtenances, and incidentals needed for acceptable functioning system, as shown on the Lift Station 15 Plans, in conformance with the provisions in the Technical Specifications, and as directed by the Engineer. https://pbsystem.planetbids.com/portal/14769/bo/bo-detail/90416 James Jackson 559-621-1165 James.Jackson2@fresno.gov