Quarter Circle Drive Canal Piping 2021
BID DATE
10/13/21 - 12:00
AGENCY
Nibley
ESTIMATE
n/a
SCOPE
The Quarter Circle Drive Canal Piping Project consists of installing approximately 2,200 feet of 42” HDPE DR 32.5 pipe within an existing irrigation ditch. Additionally, a headworks structure will be built at the origin of the pipe and a discharge headworks structure will be built at the termination point of the pipe. There are no road crossings to be completed. This project is located in Nibley, Utah and starts near the intersection of US 165 and Quarter Circle Drive and ends near the intersection of 250 West and Quarter Circle Drive. The canal does run along several back yards in a residential area and will require tree removal and vegetation cleared and grubbing. Attendance at the pre-bid tour is requested and highly encouraged. sdwood@sunrise-eng.com