Access the Full Project by Clicking here!
Bidjugde
JOB
Isola El Cidro Ranch
BID DATE
08/17/21 - 10:00
AGENCY
Sandbox Development Consultants
ESTIMATE
n/a
SCOPE
Sewer house service will extend 2’ beyond Public Utilities Easement (P.U.E.), to be marked with a metal 2” x 4” painted green extending from the service pipe 3’ above grade minimum. Sewer services to be a minimum 6’ and a maximum 8’ below grade, or as specified by the governing agency. Contractor shall not backfill any sewer service or line until it has been inspected and as-built. All services to be installed to allow water meters to be level and perpendicular. Water boxes are to be provided and set by water Contractor after concrete sidewalk is installed. Contractor will be responsible to adjust any curb stops to proper height from sidewalk at time boxes are installed per Client and municipality requirements. Bid shall include all; storm, drain structures except catch basins, scuppers, and drywells. Contractor shall include tie in to drywells. anthony@sandboxdevelopment.com

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT