Access the Full Project by Clicking here!
Bidjugde
JOB
Weyand Pipeline Turnout 2 DW 53
BID DATE
10/12/21 - 10:00
AGENCY
Solano Irrigation District
ESTIMATE
$950,000
SCOPE
The project includes installing approximately 1,234 feet of 48-inch diameter DR 17 HOPE pipe, removing and replacing approximately 1,503 feet of monolithic concrete pipe with 48-inch diameter DR 17 HOPE pipe, connections to existing concrete control structures, demolition and removal of concrete vents and junction boxes, abandonment of existing pipeline with cellular concrete or sand, installation of valves, appurtenances and surface restoration. The District has pre­ purchased the 48-inch DR 17 HOPE pipe and is in the process of pre-purchasing 12" and larger valves and fittings. See Section O1100 and Appendix C for details on District furnished materials. https://www.bpxplanroom.com/jobs/602/details/weyand-pipeline-turnout-2-to-dw-53 nmcwilliams@sidwater.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT