Access the Full Project by Clicking here!
Bidjugde
JOB
West Cliff Drive Storm Damage Repair
BID DATE
10/14/21 - 2:00
AGENCY
Santa Cruz - CA
ESTIMATE
$550,000
SCOPE
Due to an unacceptable amount of erosion on the outboard side of the West Cliff path at the bluff face, this project will restore the path to an acceptable width by constructing a structural section which will carry the path, the inboard side will include a retaining wall and the outboard side will consist of a curb supporting a railing. This whole section will be constructed in concrete and will be founded on 13 cast in drilled hole (CIDH) piers and will extend approximately 122 feet, connecting to the existing path at either end. A guardrail will be constructed alongside the alignment of West Cliff drive to preserve safety. https://www.ebidboard.com/public/projects/showproject.asp?mbrguid={ABAB07D2-4AD4-4494-8A29-E9C52EB9572A}&projectguid={E74EC7D0-6BF0-454E-94D1-62C456CEF4F4} mlizarraga@cityofsantacruz.com
UPDATES