Access the Full Project by Clicking here!
Bidjugde
JOB
Calle Real Waterline Improvements
BID DATE
10/27/21 - 2:00
AGENCY
San Clemente
ESTIMATE
$880,000
SCOPE
Remove existing 8-inch asbestos cement pipe waterline in Calle Real and replace with 12-inch PVC C900 pipe. Abandon existing Calle Andalucia Pressure Reducing Station and construct new pressure reducing station at the same Calle Real – Calle Andalucia intersection. Construct pressure regulators at 22 residential sites on Calle Andalucia. Construct check valve vaults at the Calle Mayo and Calle Abril intersections with Calle Real. https://pbsystem.planetbids.com/portal/28939/bo/bo-detail/87080 Amir K. Ilkhanipour 949-361-6140 ilkhanipoura@san-clemente.org
PREBID
10/6/2021 9:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT