Wastewater Collection System Rehabilitation 2021
BID DATE
10/14/21 - 9:00 LIVE!
AGENCY
Tempe
ESTIMATE
$2,024,206
SCOPE
f installing Cured-In-Place (CIPP) liner into existing sewer pipe, epoxy coat access manholes; install new 48-inch and 60-inch diameter manholes; remove and replace sewer pipe; install CIPP patches and install lateral seal connections. Work also includes provided post rehabilitation/replacement CCTV documentation. The project includes (22) pipe segments and (82) manhol. Results for last year's rehab: Insituform - AZ - $1,565,216 Achen Gardner Construction - $3,291,591 wendy_springborn@tempe.gov engineering_bids@tempe.gov