Central Regional Wastewater System Mountain Creek Interceptor
BID DATE
11/4/21 - 2:00
AGENCY
Trinity River Authority Texas
ESTIMATE
n/a
SCOPE
The project scope includes, but is not limited to, the following major work items: Construction of 6,500 linear feet (LF) of 90-inch diameter fiberglass reinforced polymer mortar pipe (FRPMP) gravity sewer interceptor, by open cut and other than open cut methods Removal of existing inactive 54-inch diameter pipe when encountered in the same trench, and filling of remainder of existing 54-inch diameter pipe with CLSM to remove from active service Construction of 20 FRP manholes Construction of 750 LF of 90-inch FRPMP under Union Pacific Railroad right-of-way and two separate TxDOT rights-of-way using tunnel liner plate Coordination with future tie-in connections Modifications to the Central Regional Wastewater System (CRWS) Wastewater Treatment Plant (WWTP) construction entrance; remove/replace contractor access gate Erosion control and fence improvements https://www.civcastusa.com/project/613ba25e9a24c3fac09a0823/summary davist@trinityra.org
UPDATES